    Summary of construction that will impact Aragon High School this Summer: 

    • Loss of power to the entire site July - August 9.
    • Baseball and FlexField Project: Completion of project slated for Summer 2024.
    • Solar Canopies
    • Public Facing EV Charging Stations
    • Fire Alarm Replacement: Fire watch may be required to accommodate personnel on-site (Contractor Responsibility)
    • HVAC Controls (District Wide)
    • Switchgear Replacement: Site will be without power for an estimated duration of four weeks.

     

    Burlingame

    Summary of construction that will impact Burlingame High School this Summer:

    • Heavy Construction and little accessibility
    • Building C Music Classroom Renovation 
    • New Gym Construction
    • Solar Canopies: Base work will be done and the solar panels will be installed following completion of the gym project.
    • Public Facing EV Charging Stations
    • HVAC Controls (District Wide)
    • Fire Alarm Replacement: Most work will take place on swing shifts to accommodate Summer school.

    Capuchino 

    Summary of construction that will impact Capuchino High School this Summer: 

    • No major construction taking place
    • Backstop safety netting at the Baseball field
    • Solar Canopies
    • Public Facing EV Charging Stations
    • HVAC Controls (District Wide)
    • Fire Alarm Replacement: Work will take place on a swing shift to accommodate Summer School.

    District Office

    Summary of construction that will impact the District Office this Summer: 

    • Solar Canopies
    • EV Charging

    Hillsdale

    Summary of construction that will impact Hillsdale High School this Summer: 

    • The site will have a lot of work being done, but will be accessible.
    • Phase 3 Site Improvements: Painting and site improvements at various site locations
    • Solar Canopies
    • EV Charging
    • Tennis Courts
    • Fire Alarm Replacement

    Mills

    Summary of construction that will impact Mills High School this Summer: 

    • Loss of power to the entire site June - August 9
    • Site Improvements at the façade of the school
    • Solar Canopies
    • Public Facing EV Charging Stations
    • HVAC Controls (District Wide)
    • Fire Alarm Replacement
    • Switchgear Replacement: Site will be without power for an estimated length of four weeks.

    San Mateo

    Summary of construction that will impact San Mateo High School this Summer: 

    • Heavy Construction and limited access to the site.
    • Tennis Courts
    • Stadium Turf Replacement
    • Chiller Boiler Replacement
    • Solar Canopies
    • Public Facing EV Charging Stations
    • HVAC Controls (District Wide)
    • Fire Alarm Replacement
    • New Gym Construction